The most exciting change is a new roof was put on. The roof is made of 50 year shingles, and was much needed, both for practical and aesthetic reasons. New gutters were also installed. |
|
Another change was to the shrine room and library. After the flood the library was moved to the center of the resident's area. To do that the wall that had been in place there was removed. In the photo on the right, Wynn is working to rebuild a new wall. |
![]() |
With the room that had been the library now empty, the shrine room was upgraded. After cleaning it out the walls were painted and a new carpet was installed. The changes are still very much afoot. After completing the shrine room the plan is to upgrade the men and women resident's dorms. |
![]() |